Monday 18 November 2013

Final Submission Experiment 2

 
Final Movie Trailer
 
Money shot Images









 
Dropbox link for work files:
if the link doesn't work, please use the below ID & password.
Password: bang1029
 
*Version for Crysis- 3.4.5.6666
 
 
 

Study on Materials

Materials that can be applied

Test images of exporting models to Crysis

Research on building decaying

How buildings decay

Week 5 Task

Week 5 Task images.

Week 4 Task

5 Reference movies

Direction of my chosen building


My Chosen building for Experiment 2 is Barcelona Pavilion. I will explore the building's structure and its use of materials in order to reflect this in my model to capture its essence and realistic setting. The building's use of hidden structure system and understanding of this will be the challenging part of this project. In order to understand the building and its detail, I have looked into its plans & structure plan to analyse its hidden structures. 
Barcelona Pavilion Elevation view

Walls layout 

Drawings showing its structure column detail 


Building's signature column detail in Mirror S/S 


I will further investigating the building's material and how it decays in natural form. Also how the building's architecture may fail in 100 year time. 

Saturday 16 November 2013

Week 3 Task



Teapot and other objects have been successfully imported into Cry.

However I have encountered some problems in using the Ray fire plug in which showed such error message as below.
This has been asked to Vinh, to quote;

"The main issue with rayfire is the “destination” of the installation path. Make sure it installs to YOUR 3ds max folder. Sometimes it is called “3ds max design”, but other times it is called “3ds max architecture” or “3ds max”"
Issue has been resolved.